refresh Phase 2A transaction and readiness gates

This commit is contained in:
makearmy 2026-07-12 17:36:55 -04:00
parent 2cf249d6f2
commit da03be61a9
23 changed files with 2409 additions and 37 deletions

View file

@ -18,6 +18,8 @@ Status: revised pre-implementation plan. Work stops at the Milestone 0 host-runt
- Use deterministic CPU BGBye initially; defer optional rootless GPU provisioning.
- Approve browser-profile-scoped local CA trust for HTTPS testing.
- Resolve authentication and disk-quota policy separately; confirm nonproduction storage/capacity locations.
- Use the refreshed post-NoMachine 220-package checksummed baseline; require exact disposition of the reviewed 234 DrKonqi desktop crash-processing failures and hard-stop on any fingerprint change or other failed unit.
- Verify the repaired `/.snapshots` Btrfs subvolume and create, number, and independently verify an explicit pre-upgrade Snapper snapshot; do not enable Btrfs quotas or treat unavailable quota accounting as snapshot failure.
- Execute every inert positive and negative preflight in `host-runtime-plan.md` before starting the user manager, Docker, Codex, or application work.
3. **Reversible canonical-path consolidation — separately approval-gated**